Energization of Overhead Wires on the Valley Line Southeast LRT

EDMONTON, AB – July 9, 2021 – Starting on or about Monday, July 12th, 2021, the overhead wires for the Valley Line Southeast LRT along 66 Street between Whitemud Drive and 41 Avenue, and along 75 Street between Roper Road and Whitemud Drive, will be permanently energized. Energization of this segment means that Light Rail Vehicle (LRV) testing will be occurring, intermittently, in this area.  Testing is already underway to the south (along 66 Street from 28 Avenue to 41 Avenue). 

As construction progresses, the overhead wires are gradually being energized in each area of the 13-kilometre alignment beginning in Mill Woods and ending in Downtown. 

For your safety, overhead wires should always be considered energized when strung from power pole to power pole.           

FOR YOUR SAFETY:

  • Coming into contact with live overhead wires can lead to serious injury or death. Please be aware of your surroundings. Keep all high reaching devices such as ladders, drones, and remote-controlled planes away from the overhead wires.
  • Use designated pedestrian walkways and only cross the tracks at designated crossings.
  • Always follow the direction of construction personnel and flaggers.
  • Always follow traffic and pedestrian signs and

Thank you for your understanding and patience as the project progresses.
For the most current, up-to-date information in your area, please visit http://transedlrt.ca/advisories/.

Please refer to the attached map for more details. For more information, visit our website transedlrt.ca or contact us via email at info@transedlrt.ca or by phone 780-224-0964.

Stay in Touch

Get the latest updates on progress reports, disruptions and Valley Line LRT news delivered straight to your inbox.

  • This field is for validation purposes and should be left unchanged.

If you are having trouble receiving the newsletter, kindly re-subscribe to TransEd’s mailing list and check your email privacy settings.