Train Testing Safety Messages
The Valley Line Southeast low-floor trains are now testing along the 13-kilometer LRT alignment from Mill Woods to Downtown. The low-floor LRT has a few differing features from the current high-floor LRT.
Safety is always our priority at TransEd, please take a minute to review a few train testing safety messages below.