Valley Line Southeast Project

Construction of stage one of the Valley Line Light Rail Transit (LRT) will connect Mill Woods to downtown Edmonton with about 13.1 km of light rail transit. This stage includes 11 stops, an elevated station incorporating a transit centre and Park & Ride, and a transfer point to the existing LRT routes at Churchill Square.

The Valley Line Southeast is different from the current high-floor LRT system that Edmonton operates. The Valley Line Southeast features new, low-floor, urban-styled trains that will provide more pedestrian-friendly access with at street level stops. And, in residential and commercial areas, embedded tracks will be integrated to the established design and traffic flow of the area.

Pre-construction work began in March 2016 and stage one of the City of Edmonton’s Valley Line LRT is expected to be operational in 2023.

Stay in Touch

Get the latest updates on progress reports, disruptions and Valley Line LRT news delivered straight to your inbox.

  • This field is for validation purposes and should be left unchanged.

If you are having trouble receiving the newsletter, kindly re-subscribe to TransEd’s mailing list and check your email privacy settings.