
Roper Road Intersection Traffic Flip
EDMONTON, AB – September 17, 2019 – Starting on or around September 20, 2019, eastbound and westbound traffic on Roper Road at 75 Street will be shifted to the south side of the road.
This shift is to accommodate work happening on the north side of the intersection.
This flip will occur during night hours in order to minimize traffic disruptions (9:00 p.m. to 6:00 a.m.). The intersection will be controlled by Edmonton Police Service during this time.
To accommodate this work, the public will be impacted in the following areas:
- East/westbound traffic will be shifted to the south side of the Roper Road and 75 Street intersection.
- One lane in each direction will be maintained.
- Pedestrian access will be maintained.
There will be noise associated with the work. TransEd is committed to following all City of Edmonton bylaws and regulations, and has obtained an overnight roadwork permit so that work can take place during nighttime hours in order to minimize major daytime traffic disruptions. (City of Edmonton Bylaw C14600).
During this time please watch for, and observe, all traffic detours and direction of construction personnel. We appreciate your patience as we build the Valley Line LRT.
For the most current, up-to-date information in your area, please visit: http://transedlrt.ca/advisories/.
Please refer to the attached map for more details. For more information, visit our website http://transedlrt.ca/advisories or contact us via email at info@transedlrt.ca or by phone 780-224-0964.