EDMONTON, AB – December 12, 2016 – In the evening hours of December 19, 2016,  investigative work will take place on Whitemud Drive under the 66 St./75 St. Bridge. The work will include examination of the existing storm sewer. Lane closures will occur during non-peak/night hours (7:00 p.m. – 6:00 a.m.). This work will be completed by 6:00 a.m. December 20, 2016.

Work will begin on the east and west-bound inside lanes. Once complete, work will move to the east and west-bound outside lanes.

To accommodate this work, the public may be impacted in the following areas:

  • Single lane closures will be in effect. First on the inside lanes and then on the outside lanes of Whitemud Drive at the 66St./75 St. bridge.
  • Traffic disruptions along Whitemud Drive will be minimal.
  • There will be no impact to pedestrians or cyclists.
  • Please observe all construction signage and the directions of personnel in the area.

For more information, please contact us via email at info@transedlrt.ca or by phone 780-224-0964.