Access to 97 Street from 102 Avenue closed

EDMONTON, AB – October 2, 2018 – Starting on or around October 8, 2018, access onto 97 Street from 102 Avenue will be closed. Motorists can enter the Canada Place parking garage from the west (right turn in) and must exit the garage going west (left turn out).

This work will last for approximately two weeks.

To accommodate this work, the public will be impacted in the following areas:

  • Access to 97 Street from 102 Avenue will be closed.
  • The Canada Place parking garage will be a right turn in and left turn out only.
  • Pedestrian access will be maintained.

Please refer to the attached map for more details. For more information, visit our website https://transedlrt.ca/advisories or contact us via email at info@transedlrt.ca or by phone 780-224-0964.

 

EDMONTON, AB – May 17, 2018 – Starting on or around May 28, 2018, access in and out of 84 Avenue and 86 Avenue onto 83 Street will be closed.

The traffic lights at 86 Avenue will be removed and replaced with LED flashing lights for pedestrian crossings.

As alternate routes, motorists can use 90 Avenue or 82 Avenue.

To accommodate this work, the public will be impacted in the following areas:

  • Access in and out of 84 Avenue and 86 Avenue onto 83 Street will be closed.
  • The traffic lights at 86 Avenue and 83 Street will be removed and replaced with flashing pedestrian crossing lights temporarily.
  • The flashing lights near the library will also be removed at this time.
  • Pedestrian access will be maintained.

Vehicle, bicycle, and pedestrian traffic disruptions will vary by location. During this time please watch for, and observe, all traffic detours and direction of construction personnel. We appreciate your patience as we build the Valley Line LRT.

Please refer to the attached map for more details. For more information, visit our website https://transedlrt.ca/advisories or contact us via email at info@transedlrt.ca or by phone 780-224-0964.

EDMONTON, AB – May 11, 2018 – Starting on or around May 21, 2018, access in and out of 84 Avenue and 86 Avenue onto 83 Street will be closed.

The traffic lights at 86 Avenue will be removed and replaced with LED flashing lights for pedestrian crossings.

As alternate routes, motorists can use 90 Avenue or 82 Avenue.

To accommodate this work, the public will be impacted in the following areas:

  • Access in and out of 84 Avenue and 86 Avenue onto 83 Street will be closed.
  • The traffic lights at 86 Avenue and 83 Street will be removed and replaced with flashing pedestrian crossing lights temporarily.
  • The flashing lights near the library will also be removed at this time.
  • Pedestrian access will be maintained.

Vehicle, bicycle, and pedestrian traffic disruptions will vary by location. During this time please watch for, and observe, all traffic detours and direction of construction personnel. We appreciate your patience as we build the Valley Line LRT.

Please refer to the attached map for more details. For more information, visit our website https://transedlrt.ca/advisories or contact us via email at info@transedlrt.ca or by phone 780-224-0964.

SECOND UPDATE: on the evening of Friday, September 15, 2017, there will be an intersection changeover at 66 Street and 28 Avenue.  Work will begin at 9:00 P.M. and continue until approximately 6:00 A.M.  A noise permit has been obtained. Motorists traveling in the area can expect delays and police traffic control during this time.

FIRST UPDATE: on Thursday, August 31, 2017, there will be traffic rerouting at the 34 Avenue and 66 Street intersection. Traffic will be pushed to the west and north sides of the intersection. This will take place in the evening.

EDMONTON, AB – August 3, 2017 – Starting on or about August 10, 2017,  66 Street will be partially closed from south of 28 Avenue to Whitemud Drive to allow painting of lanes on the new street. Motorists will also be unable to access parts of 28 Avenue, 34 Avenue, and 38 Avenue at this time. These closures will only be happening in evening and night hours for a short period  of time.

To accommodate this work, the public will be impacted in the following areas:

  • 66 Street will be partially closed from south of 28 Avenue to Whitemud Drive.
  • 28 Avenue will be closed from Lakewood Drive to Youville Drive.
  • 34 Avenue will be closed from 71 Street to 58 Street.
  • 38 Avenue will be closed from Millbourne Road to 62 Street.
  • These closures will be happening one at a time so motorists will still have access.
  • Please visit https://www.edmonton.ca/ets/general-service-alerts.aspx for all ETS changes and updates
  • Pedestrian access will be maintained

Alternate Routes:

  • To avoid any potential delays, motorists can use 91 Street or 50 Street as alternate routes.

There will be noise associated with the work. TransEd is committed to following all City of Edmonton bylaws and regulations, and has obtained an overnight roadwork permit so that work can take place during nighttime hours in order to minimize major daytime traffic disruptions. (City of Edmonton Bylaw C14600).

 

Vehicle, bicycle, and pedestrian traffic disruptions will vary by location. During this time please watch for, and observe, all traffic detours and direction of construction personnel. We appreciate your patience as we build the Valley Line LRT.

Please refer to the attached map for more details. For more information, visit our website https://transedlrt.ca/advisories or contact us via email at info@transedlrt.ca or by phone 780-224-0964.

Stay in Touch

Get the latest updates on progress reports, disruptions and Valley Line LRT news delivered straight to your inbox.

  • This field is for validation purposes and should be left unchanged.

If you are having trouble receiving the newsletter, kindly re-subscribe to TransEd’s mailing list and check your email privacy settings.